期刊文献+

一种基于时间变量的产品开发管理流程模型

A Model Based on Time for Product-Developing-Management
下载PDF
导出
摘要 根据国防领域高新技术产品研发项目管理流程再造工作的需要,建立了一种基于时间的M-PDP流程(Military equipment Product Developing Process)描述模型。模型以第三代门径管理系统(SGS)理论为主要依据,设立了三个主要阶段;对应国防科研项目管理业务流程的特点,将流程中的审批关口与活动结合到一起,提出了"活动-决策对"概念,与实际情况更加符合,同时这样也简化了模型分析的难度;建立的M-PDP流程模型,能够反映该类研发项目的管理过程,体现其串行或并行关系,能够判断活动或决策是否增值。 The M-PDP (Military photoelectric system Product Developing Process) model based on time is described that can be used to the Business Process Reengineering of the new-product-developing management for the military high-technology equipment. According to the third generation SGS (Stage-Gate System), three main stages are set up in the model. Corresponding the characteristics of the managing operation process in the military research project, each examine gate is combined with an activity of process. The concept of "Activity-Examine Couple" is presented to simplifying the processes analyse. The M-PDP model is useful to reflect the managing process of the project, represent their serial or concurrent connection and estimate whether an activity or examination is valuable or not.
作者 徐彤 刘东苏
出处 《科技信息》 2009年第17期31-33,共3页 Science & Technology Information
关键词 产品开发管理 流程再造 管理模型 Product development management Business process reengineering Management model
  • 相关文献

参考文献4

  • 1(美)PrestonG.Smith,(美)DonaldG.Reinertsen著,吴海棠.产品开发新法则[M]清华大学出版社,2005. 被引量:1
  • 2(加)罗伯特·G.库柏(Robert,G.Cooper)著,刘崇献,刘延译..新产品开发流程管理[M].北京:机械工业出版社,2003:442.
  • 3(美)小塞缪尔·J·曼特尔(Samuel,J.Mantel,Jr.)等著,林树岚,邓士忠译..项目管理实践[M].北京:电子工业出版社,2002:350.
  • 4(美)H.詹姆斯·哈林顿(H.James,Harrington)等著,唐宁玉等译..项目变革管理[M].北京:机械工业出版社,2001:440.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部