摘要
分析城区中心旧道路存在的问题及其产生的原因,通过总结提出了改造设计方案。以太原市中心的南内环街道路改造为例,介绍了"人非一体化共板"的道路设计方法及快速公交设计思维,分析了实施后的优缺点。还对城市道路慢行系统及快速公交专用车道的改造方案作了评价,并提出了相关建议。
Some problems and reasons of the urban centre old roads were introduced and a reconstruction design plan was presented in the paper.Taking an example of the south inner ring road reconstruction in Taiyuan urban centre,the design method of pedestrian and non-mechanical-vehicle integrated slab and the idea of rapid public traffic were put forward,then its practical advantages and disadvantages were also analyzed.Finally,the author evaluated the reconstruction plans of urban roads slow traffic system and rapid bus accommodation lane and made some personal recommendations.
出处
《中国市政工程》
2009年第3期8-9,共2页
China Municipal Engineering
关键词
城区中心道路改造
人非一体化共板
快速公交
urban centre road reconstruction
pedestrian and non-mechanical-vehicle integrated slab
rapid public traffic