摘要
结合某40 m后张法预应力T梁桥的施工案例,主要介绍了桩基水上平台的施工方案的制定,从钢管桩水上平台设计、钢管桩设计到钢管桩稳定性验算分析等内容进行了详细的阐述,积累了桥梁桩基施工经验。
Taking a 40 rn post-tensioning prestressed T beam as examples, the paper mainly introduces making of the constructional scheme on the terrance above water of pile foundation, it states from several aspects, including design of steel pipe pile terranee, design of the steel pipe pile, checking of the stability of steel pipe pile and so on, thus accumulates experiences for construction of pile foundation.
出处
《山西建筑》
2009年第19期328-329,共2页
Shanxi Architecture
关键词
桥梁桩基
钢管桩
施工
设计
bridge pile foundation, steel pipe pile, construction, design