摘要
结合东莞北王公路扩建工程软土地基处理的工程实践,从施工前的准备、施工过程、竣工检测、桩体常遇到的问题原因分析及排除方法等方面,阐述粉喷桩处理软基施工质量的控制措施,以确保粉喷桩处理软基的加固效果。
Combined with practical soft soil roadbed treatment engineering in extension work of Wanggong road in north of Dongguan, from preparation work, construction process, completion inspection and other aspects reasons caused the problems encountered in construction process of cement injection pile are analyzed, at the same time corresponding removal methods are proposed as well as construction quality control measures in order to ensure the reinforcement effects of cement injection pile in soft soil roadbed treatment.
出处
《山西建筑》
2009年第19期108-109,共2页
Shanxi Architecture
关键词
粉喷桩
施工质量
控制措施
cement injection pile, construction quality, control measure