期刊文献+

基于C-PMBOK的广义WBS集成研究 被引量:2

Integration of Generalized-WBS Based on C-PMBOK
下载PDF
导出
摘要 提出了广义工作分解结构(WBS)的概念,研究了广义WBS的思想基础、分解方法、准则及其意义,并在C-PMBOK框架下,进一步提出了项目各分解结构分解流程和集成模型,以此为技术手段贯穿于项目管理的各个阶段和各项管理活动,使复杂的项目系统简单化,然后利用集成思想保证项目的完整和统一。 This article puts forward the concept of the generalized WBS, studies its basis, breakdown methods, principles and the significance. Based on the framework of the Chinese Project Man agement body of knowledge (C-PMBOK) gration model, which could be employed , the article further proposes breakdown processes and inteas a technical means throughout the various phases of the project to simplify the project systems, and guarantee the integrity and unity of projects.
出处 《管理学报》 CSSCI 2009年第6期737-742,共6页 Chinese Journal of Management
基金 云南省院省校合作基金(KKSX200708006)
关键词 C—PMBOK 广义WBS 系统 模块化 集成模型 C-PMBOK generalized-WBS system module integration model
  • 相关文献

参考文献19

  • 1中国(双法)项目管理研究委员会著..中国项目管理知识体系[M].北京:电子工业出版社,2006:402.
  • 2CLELAND D L, KING W R. Project Management Handbook[M]. New York: Van Nostrand Reindold Company Inc. , 1983 : 283- 296. 被引量:1
  • 3RAD PARVIS F. Advocating a Deliverable-Oriented Work Breakdown Structure [J]. Cost Engineering, 1999,41(12):35-39. 被引量:1
  • 4DE HEREDIA S R, SANTANA L G. Project-breakdown Structure:The tools for Representing the Project System in Project Management [J]. Int. J. Proj. Manage. ,1991,9(3) :157-161. 被引量:1
  • 5MANSUY J. Work Breakdown Structure: A Simple Tool for Complex Jobs[J]. Cost Eng. , 1991,3(12) : 15-18. 被引量:1
  • 6江萍,成虎.施工项目结构分解(WBS)方法及准则研究[J].东南大学学报(自然科学版),2000,30(4):105-108. 被引量:69
  • 7豪根GT.有效的工作分解结构--项目管理经典译丛[M].北京广联达慧中软件技术有限公司,译.北京:机械工业出版社,2005:22-32. 被引量:1
  • 8LEEN S K,BOYD C P. Information Management to Integrate Cost and Schedule for Civil Engineering Projects[J].Journal of Construction Engineering and Management, 1998,124 (5): 381 - 389. 被引量:1
  • 9美国项目管理协会.项目管理知识体系指南,PMBOK2004[M].3版.卢有杰,王勇,译.北京:电子工业出版社,2006:97-101. 被引量:1
  • 10HOMER J L,GUNN P D. Work Structuring for Effective Project Management[C]//Project Management Institute 26th Annual Seminar, Symposium. New Orleans LA, 1995 - 84. 被引量:1

二级参考文献2

共引文献68

同被引文献33

  • 1NORMAN Eric S, BROTHERTON Shelly A, FRIED Robert T. Work Breakdown Structures: The Foundation for ProjectManagement Excellence[J]. Project Management Journal, 2009. 被引量:1
  • 2ALIREZA H G S, EMAMIZADEH B. Designing work breakdown structures using modular neural networks[J]. DecisionSupport System, 2007,(44): 202-222. 被引量:1
  • 3SHAN Miyuan, SHE Xiaohua, REN Bin. A data mining approach to forming general work breakdown structure[C]// IEEE,2011:330-334. 被引量:1
  • 4NADJA damij, TALIB Damij, et al. A methodology for business process improvement and IS development[J]. Informationand Software Technology, 2008,(50): 1127-1141. 被引量:1
  • 5WANG Y P, GE J H, et al. Research on project level collaborative design process oriented to complex product[J]. MaterialsScience Forum, 2009, 628-629: 37-42. 被引量:1
  • 6HAFEDH Mili, GUITTA Bou Jaoude’et al. Business process modeling languages: sorting through the alphabet soup[M].ACM Computing Surveys, Yol.43, NO.l, Article 4,,November 2010. 被引量:1
  • 7LAMERS M. Do you manage a project, or what? A reply to “Do you manage work, deliverables or resources5^J].International Journal of Project Management, 2002(20): 325-329. 被引量:1
  • 8ZHANG Jie, LI Yuan, YU Jianfeng, et al. A new method for generating work breakdown structure on aircraft assemblyscheduling[C]// IEEE, 2008,12985-12988. 被引量:1
  • 9LEE Jonathan, DENG Whanyo, et al. Integrating process and work breakdown structure with design structure matrix[J].Journal of Advanced Computational Intelligence and Intelligent Informatics, 2010, 14(5):512-522. 被引量:1
  • 10WANG Kai, LIU Yi, LI Wenzheng. An approach to modeling the airplane cooperative design process based on task-relatedwork breakdown structure[C]//The 1st International Conference on Information Science and Engineering (ICISE2009),2009:113-116. 被引量:1

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部