期刊文献+

土石坝基础混凝土防渗墙关键技术指标选择 被引量:13

Selection of key technical indexes for concrete cut-off wall for foundation of rock-earth fill dam
下载PDF
导出
摘要 针对土石坝基础混凝土防渗墙设计和施工所关注的混凝土强度等级和适应地基和坝体的弹性比关系,对现行技术标准的应用和理解等重点问题进行了评述,并列举了8项已建、在建重点工程防渗墙设计技术参数,以便对在建和正在设计的同类工程有所帮助和借鉴。 The key issues of the application and understanding of the current technical criteria for the concrete strength grade and the elastic ratio adaptable to the relationship between foundation and dam body concerned with the construction and design of the concrete cut-off wall for earth-rock fill dam are discussed herein, in which the design and technical parameters for the cut-off walls of 8 key existed and constructing projects are listed as well, so as to provide some references for the similar projects under construction and design concerned.
作者 关志诚
出处 《水利水电技术》 CSCD 北大核心 2009年第5期31-34,共4页 Water Resources and Hydropower Engineering
关键词 混凝土防渗墙 土石坝 覆盖层 设计指标 concrete cut-off wall earth-rock fill dam overburden key technical indexes
  • 相关文献

参考文献4

  • 1水利部水利水电规划设计总院.黄壁庄均质副坝防渗墙漏浆塌方(坝)处理蓄水安全鉴定报告[R]. 被引量:1
  • 2水利部水利水电规划设计总院.冶勒工程初期蓄水安全鉴定[R].北京:水电水利规划设计总院,2006. 被引量:1
  • 3岳广润,石峰,李建军,等.土石坝技术(2008年)[M].北京:中国电力出版社,2008. 被引量:1
  • 4苗喆,张世东,钱应德,等.土石坝技术(2007年)[M].北京:中国电力出版社,2007. 被引量:1

同被引文献69

引证文献13

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部