糯扎渡心墙堆石坝土石方调配平衡研究 被引量:5

Research on Balancing Earth-Rock Works Allocation of Nuozhadu Core Rockfill Dam
下载PDF
导出
摘要 通过分析糯扎渡心墙堆石坝土石方填筑和开挖工程之间的料源平衡和进度协调的关系,采用线性规划方法,结合施工中的实际因素,建立土石方调配优化数学模型。通过实际运用,达到了节约资源、节省费用、合理快速施工的目的。 In order to balance the relation between earth-rock works excavation and earth-rock filling in the construction process of the Nuozhadu Core Rockfill Dam, an optimized mathematical model was established by adopting the linear programming method and in combination with the practical factors during construction. Through the numerical simulation of construction process, the aims of source economizing, cost saving and rationally quick construction attained.
作者 陈钢 陈朝
出处 《长江科学院院报》 CSCD 北大核心 2009年第6期60-62,共3页 Journal of Changjiang River Scientific Research Institute
关键词 糯扎渡水电站 土石方调配 心墙堆石坝 Nuozhadu Hydropower station earthwork allocation core rockfill dam
  • 相关文献

参考文献4

二级参考文献6

共引文献36

同被引文献27

  • 1罗德仁,邹自力,汤江龙.工程土方量计算比较分析[J].东华理工学院学报,2005,28(1):59-64. 被引量:119
  • 2袁建丰.线性规划在三峡右岸土石方调配中的应用研究[J].水力发电学报,2006,25(1):99-103. 被引量:12
  • 3冯吉新,解红军,吉世道.双沟水电站面板堆石坝填筑施工设计[J].东北水利水电,2007,25(1):26-26. 被引量:1
  • 4Cao Shengrong, Shen Mingliang, Zhou Hougui. Optimization model for earth - stone allocation system in large - scale hydraulic engineering and application in Shuibuya Project[ C ]//The 2006 International Con- ference on Machine Learning and Cybernetics, Dalian, 2006,2368 - 2372. 被引量:1
  • 5Ahamd A Moreb. Linear Programming Model for Finding Optimal Roadway Grades that Minimize Earth - Rock Cost[ J]. European Jour- nal of Operational,1996(5) : 48 - 154. 被引量:1
  • 6Shahram Mohamad Karimi, Seyed Jamshid Mousavi, All Kaveh, et al. Fuzzy Optimization Model for Earthwork Allocations with Imprecise Pa- rameters [ J ]. Canadian Metallurgical Quarterly, 2007,133 ( 2 ) : 181 - 190. 被引量:1
  • 7Mayer, Stark. Prodnctivity Setimation in baker - acter/dump - turck earth moving operation[ J]. Trans Port, 1995, ( 2 ). 被引量:1
  • 8瀑布沟水电站可研报告施工组织设计[R].中国水电顾问集团成都勘测设计研究院,2005. 被引量:1
  • 9DENG T J,HE H Z. Deviation Analysis of Earthwork Calculated by Square Grid Method[A].UK:World Academic Union,2008.594-600. 被引量:1
  • 10AL-JIBOURI S H,MAWDESLEY M J,ASKEW B H. A Computer System for Modeling the Process of Earthwork Planning in Linear Construction Projects[J].{H}INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY,2004,(1/2/3):90-101. 被引量:1