期刊文献+

浅谈建设高产高效现代化矿井的技术途径 被引量:2

Technical Approach to Construct High-production and High-efficiency Modernization Mine
下载PDF
导出
摘要 从技术层面探索建设高产高效现代化矿井是一个复杂的课题,结合富力煤矿南部七层开拓设计和-240nq国铁煤柱区(18-2)层巷道支护及开采的工程实践,从优化设计、改进支护方式、引进先进的设备和开采技术及强化管理等方面,综合分析了建设高产高效现代化矿井的有效技术途径。阐述了建设高产高效现代化矿井应解决的技术问题。工程应用表明,富力煤矿探索出一条可行的单产高、效益好的矿井发展之路。 Groping for the technical approach to construct high-production and high-efficiency modernization mine is a very complex topic. Combined with the development design on the seventh group coal seam and the practice on the roadway supporting and coal seam mining of -240 m level Guotie coal pillar region, comprehensively analyzed the technical approach to construct high-production and high-efficiency modernization mine from the aspects of optimizing design, improving supporting method, introducing advanced technology and strengthening the management. Elaborated the technical problem should be solved. The Application in the project shows that it is a feasible developing way with the virtue of high production and good benefit.
作者 高金标
出处 《中州煤炭》 2009年第5期75-76,共2页 Zhongzhou Coal
关键词 优化设计 矿井建设 灾害预防 高产高效 现代化矿井 optimizing design mine construction disaster prediction high-production and high-efficiency modernization mine
  • 相关文献

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部