摘要
在广东三水盐矿盐井钻进过程中,根据地层条件及钻探成本的控制,使用了2种不同体系的泥浆,通过实际应用,在钻井效率、事故预防、成本控制等方面取得了较好的成效。着重介绍了施工中使用的2种泥浆体系及其转换过程。
According to the formation conditions and drilling cost control, 2 different mud systems were applied in drilling in Sanshui salt mine of Guangdong with satisfied drilling efficiency, accident prevention and cost control. The paper introduced the 2 drilling mud systems in the construction and the system conversion process.
出处
《探矿工程(岩土钻掘工程)》
2009年第5期19-21,共3页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
盐矿
钻井
淡水泥浆
盐水泥浆
体系转换
salt mine
drilling
freshwater mud
saltwater mud
system conversion