坛厂隧道在施工期间出现涌水、涌泥现象,介绍了隧道的病害情况,并提出了综合治理方案。对工程实施综合治理及措施进行了探讨。
There are gushing water and projecting mud in the period of construction of the Tanchang tunnel. Disease problems of the tunnel are introduced in detail. And comprehensive treatment measures are presented. It is approved by the accomplishment of the tunnel that the comprehensive treatment measures are rational and safe.