期刊文献+

急斜长壁开采顶板破断运动及危险性 被引量:12

ROOF FRACTURE MOVEMENT AND ITS DANGER IN PITCH MINING OF LONGWALL FACE
下载PDF
导出
摘要 急倾斜煤层由于开采边界不规则,及其它地质和技术因素,顶板破断具有明显的随机性。在相互挤压的破断板块系统中,2~3个关键板块对工作面矿压显现有决定影响。在“回转下沉反转上升”运动中,上升区如处于控顶区上方,使支架卸载造成顶板灾害。对关键板块运动的监测反馈,是进行有效岩层控制的重要环节。较软弱底板的破坏滑移,是造成顶板随机运动复杂化的又一原因。 The roof fracture of steep seam manifests obvious random characteristic owing to irregularity of mining boundary and different stowing feature of breakage waste along faceline as well as geological and technical factors in pitch mining of longwall face. The 2~3 key plates have important influence on the ground behaviour of face in system of reciprocal extrusion fracture plates.In movement of “rotating subsidencereverse uplift',if the uplift zone is situated over the roofcontrol district, the supports will unload and lead to roof accidents. The monitoring and feedback for key plates is a key link of strata controlling effectively. The damage and slump of softish floor is another reason of making random movement of roof complicated.
作者 石平五
出处 《西安矿业学院学报》 1998年第1期1-7,共7页 Journal of Xi'an University of Science & Technology
基金 国家自然科学基金
关键词 危险性 顶板破断 急倾斜煤层 长壁开采 采煤 steep seam \ key plate \ random process \ dangerous nature
  • 相关文献

参考文献2

共引文献22

同被引文献57

引证文献12

二级引证文献219

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部