摘要 武山铜矿主溜井延伸后,因矿石含硫较高、存在粘土矿物等,主溜井振动出矿时常出现粘结振动台板、悬拱和冲斗等不利现象,甚至导致主溜井提升中断。通过分析问题的原因,武山铜矿从技术上、生产管理上采取一系列切实可行的措施,使矿山生产重新走入正轨。 After the main ore pass of Wushan Copper Mine was descended,owing to high content of sulphur and clay etc.in the ore,it offen brought about some bad effects such as ores adhering on vibrationg bed plate,arching and flashing,and even leading stop the hoisting of main ore pass.Through analyzing the problems and their causes,some technological and production managing measures have been adapted in practical production.These make the mine reset the normal production road.
出处 《矿冶》 CAS 1998年第1期1-4,共4页 Mining And Metallurgy
关键词 溜井 振动放矿 粘土矿 铜矿 Main ore pass Vibrated ore removal Clay