期刊文献+

三道湖中桥无粘结预应力混凝土主梁设计 被引量:1

Design of the prestressed concrete girders in sandaohu middle bridge
下载PDF
导出
摘要 对直线配索无粘结预应力混凝土梁截面应变进行了分析,根据极限状态下截面受压边缘混凝土应变分布形式及无粘结预应力钢束高度处的混凝土应变分析,得出无粘结预应力钢束极限应力增量的积分表达式,编制了计算程序进行求解,并与21片两集中力三分点加载实验梁的实验结果进行了对比,结果较为吻合;不计梁体弹性区段的混凝土应变时,极限应力增量计算值减少7.5~15.1MPa,占极限应力增量的1.9%~4.5%,可偏安全地予以忽略.根据理论和实验结果,对标准跨径25m的三道湖中桥上部结构预应力混凝土箱形主梁进行了设计. Strain analysis was performed to the cross sections of prestressed concrete beams with straight line unbonded tendons.Based on the strain distribution calculation of the compression concrete fiber in ultimate state,the concrete strain at the location of the unbonded tendons was integrated to establish an equation group to calculate the ultimate stress increment.A computer program was assembled to solve the equations.To verify the accuracy of the computational method,21 specimens with straight line unbonded tendons were tested to failure by two concentrated loads at 1/3 span.Comparison indicates that the calculated ultimate stress increment had shown excellent consistency with the tested results.When the strain in the elastic area of the beam was neglected,the ultimate stress increment decreased 7.5 to 15.1 MPa,accounting for only 1.9% to 4.5% of the total stress increment,which indicates that the strain in elastic area can be safely neglected.Based on the theoretical and experimental research,the unbonded tendons of the prestressed concrete box-girders in Sandaohu middle bridge were designed.
出处 《北京科技大学学报》 EI CAS CSCD 北大核心 2007年第S2期62-66,共5页 Journal of University of Science and Technology Beijing
关键词 积分 无粘结 预应力 混凝土 极限应力增量 integration unbonded prestressed concrete ultimate stress increment
  • 相关文献

参考文献3

二级参考文献14

  • 1王凡荣.无粘结预应力混凝土简支梁的要限强度分析及试验研究[M].哈尔滨:哈尔滨工业大学,2001.. 被引量:1
  • 2王永平.公路无粘结预应力混凝土技术应用研究课题试验研究报告[M].哈尔滨:哈尔滨工业大学交通科学与工程学院,1998.6-34. 被引量:1
  • 3王有志.预应力混凝土结构[M].北京:中国水利水电出版社,1998.. 被引量:4
  • 4JGJ/T92-93.无粘结预应力混凝土结构技术规程 [S].1993.JGJ/T92-93.Code of Unbonded Prestressed Concrete Structure [S].1993.(in Chinese) 被引量:1
  • 5ACI 318-89.Building Code Requirements for Reinforced Concrete [S].Farmington Hills: American Concrete Institution,1989. 被引量:1
  • 6BS 8110.Structural of Concrete: Part 1: Code of Practice for Design and Construction [S].London: British Standards Institutions,1985. 被引量:1
  • 7Mugeruma H.Seismic problems of PPC building structures with special reinfence to basic researth in Japan [A].Proc FIP Symp on Partial Prestressing [C].Tokyo: Buharest,1980.386-406. 被引量:1
  • 8Park R,Paulay T.Reinforced Concrete Structures [M].Washington: John Wiley & Sons,1975. 被引量:1
  • 9Cohn M Z.Partial Prestressing,from Theory to Practice [M].Japan: Martinis Nijbhoff Publishers,1986. 被引量:1
  • 10周履.无粘结力筋与体外力筋预应力混凝土桥梁的发展历程与现状[J].桥梁建设,1997,27(3):1-12. 被引量:32

共引文献18

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部