期刊文献+

隧道下穿高粱桥差异沉降控制 被引量:6

Control of Differential Settlement Due to Tunnel's Crossing under Gaoliang Bridge
下载PDF
导出
摘要 北京地铁四号线西直门站—动物园站区间隧道下穿既有高粱桥,为使高粱桥在隧道开挖施工过程中受到的影响达到控制要求,改变了隧道的开挖方法,由台阶法改为CRD法开挖,并对高粱桥进行了加固处理,通过数值模拟预测与现场测量的方法来监测控制桥墩的沉降以及桥墩之间的差异沉降。 The tunnels between Xizhimen station and Dongwuyuan station on metro line 4 in Beijing are planed to pass under the Gaoliang Bridge. In order to reduce the influence on Gaoliang Bridge due to the tunnel construction, the original method (bench method) of tunnel excavation is changed to CRD method and Gaoliang Bridge is also reinforced. The settlement of bridge pier and the differential settlement among bridge piers are monitored by the in-situ measurement, which are also predicted by the numerical simulation in this paper.
出处 《隧道建设》 2007年第S2期548-550,共3页 Tunnel Construction
关键词 差异沉降 深孔注浆 混凝土表面应变计 CRD施工 differential settlement deep-hole grouting surface strain gage CRD construction
  • 相关文献

参考文献4

二级参考文献3

共引文献34

同被引文献32

引证文献6

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部