5SHAMSOLLAHI P,CHEUNG K W,QUAN Chen,et al. A neural network based very short term load for ecaster forthe interim ISO New England electricity market system[A]. 22nd IEEE Power Engineering Society International Conference on Power Industry Computer Applications[C]. [s. l.] :IEEE,2001. 217-222. 被引量:1
6TRUDNOWSKI D J,MCREYNOLDS W L,JOHNSON J M.Realtime very short-term load prediction for power system automatic generation control[J]. IEEE Trans. on Power Systems,2001,9(2) :254-260. 被引量:1