结合南水北调刘老涧二站建设施工导流方案的选择,总结了在水利水电工程施工中合理利用现有工程实施施工导流,加快施工进度、降低工程造价、确保工程施工安全的经验。
Combined with construction scheme choices of the diversion engineering in South-North Water Diversion project of Liulaojian second pumping station construction,authors summarized the experience of speeding up the construction progress,reducing the construction cost and ensuring construction safety to reasonably use existing engineering for construction diversion in water resources and hydraulic engineering.