摘要
北京科技大学综合楼连廊钢结构采用整体提升工艺进行施工,提升高度超过60m。该工程通过施工模拟验算分析连廊钢结构构件在提升过程中的内力及变形,提升过程中进行施工监控,确保了工程顺利完工。
The steel porch in the office building of University of Science and Technology Beijing is constructed by the integral lifting techaology.The height of lift surpasses 60m.The project got the force and the distortion in the structure with the construction simulation calculating.By the construction monitoring in the promotion process,the project is finished successfully.
出处
《施工技术》
CAS
北大核心
2010年第S1期369-372,共4页
Construction Technology
关键词
提升
同步
施工模拟计算
lifting
synchronization
construction simulation calculating