大型桥梁整体顶升平移关键技术 被引量:23

Key technology in integral jack-up and translation engineering of large bridge
原文传递
导出
摘要 随着我国交通事业的迅速发展,旧桥改造与利用更加重要。由于桥梁顶升平移技术具有无可比拟的优越性,顶升平移工程得到越来越多的应用。通过上海南浦大桥东主引桥简支梁顶升及成都5000t系杆拱梁平移等工程阐述顶升平移关键技术。 With the rapid development of China's transport,transformation and reusing the old bridge has become more important.As the bridge jack-up and translation technology has the unparalleled advantages,jack-up and translation engineering has more and more applications.The technology of integral jack-up and translation were described in the Shanghai Nanpu Bridge Jacking Beam integral jack-up and Chengdu 5000t tied arch beam translation engineering.
出处 《建筑结构》 CSCD 北大核心 2010年第S2期687-689,共3页 Building Structure
关键词 断柱顶升 直接顶升 整体同步顶升 顶升系统 PLC液压同步控制系统 cut-off pillar and jacking direct jacking integral jack-up jack-up system PLC hydraulic synchronous control system
  • 相关文献

参考文献4

二级参考文献7

共引文献105

同被引文献102

引证文献23

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部