期刊文献+

复杂约束下的导弹作战任务规划模型和算法研究 被引量:9

Research on Model and Algorithm of Missile Operational Mission Planning under Complex Constraints
下载PDF
导出
摘要 导弹作战任务规划是一个涉及时间、资源、质量和其他关系约束的复杂问题。首先通过定义约束满足效用对基本约束满足模型进行了扩展,建立了导弹任务规划的约束满足优化模型。在此基础上,研究了任务规划模型求解的时间和效用传播算法,提出了基于综合效用的优化求解框架。该模型和求解框架易于解决具有多种约束因素的复杂问题,具有较好的通用性。通过定义软、硬约束效用,使得实际任务规划问题求解具有更好的灵活性。 Missile operational mission planning is a complex problem relate to time, resource, quality and other constraints. Basic constraint satisfaction model is extended through defining Constraint satisfaction utility at first. A constraint satisfaction optimize model about missile operational mission planning is made. On the basis, algorithms of time promulgate and utility promulgate are studied. A optimize resolving frame is presented based on integration utility. The model and algorithm frame not only are easy to solve complex problems that have manifold constraints, but also have preferable general performance. Through defining soft and hard constraints, mission planning in practice will have further flexible.
出处 《指挥控制与仿真》 2009年第2期14-17,41,共5页 Command Control & Simulation
基金 二炮工程学院创新人才资助项目(xy200703)
关键词 导弹作战任务规划 约束满足优化模型 约束效用 时间传播算法 效用传播算法 missile operational mission planning constraint satisfaction optimize model constraint satisfaction utility time promulgate algorithm utility promulgate algorithm
  • 相关文献

参考文献4

  • 1J.F.Allen.Maintaining Knowledge about Temporal Intervals[J].Communications of the ACM,1983,26(11):832-843. 被引量:1
  • 2徐瑞..基于多智能体的深空探测器自主任务规划方法与系统仿真[D].哈尔滨工业大学,2004:
  • 3Gu WenXiang,Wang Fang,Ran JiaYue.Fuzzy resource constraints graphplan[A].In Proc.5th ICMLC[C].2006:494-498. 被引量:1
  • 4Malek Mouhoub,Amrudee Sukpan.A new Temporal CSP Framework Handling Composite Variables and Activity Constraints[A].In Proc.17th ICTAI05[C].2005:1082-1089. 被引量:1

同被引文献52

引证文献9

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部