变压器通过"预防为主"的计划检修,可消除设备缺陷、排除隐患。本文详细介绍了电力变压器在大修后组装完毕,必须进行的各项电气试验和几种性能指标测量的方法及要点。
That transformer adopts the overhaul of " the prevention primarily" may eliminate the equipment flaw and hidden danger. This article introduces in detail the method and main point, which must be carried on each item of electrical test and several performance index survey, after the power transformer be overhauled and assembled.
出处
《机电产品开发与创新》
2009年第2期63-64,67,共3页
Development & Innovation of Machinery & Electrical Products
关键词
电力变压器
试验
测量
绕组
变压比
power transformer
test
measurement
winding
ratio of transformer