期刊文献+

Technology for long cable erection of a thousand-meter scale cable-stayed bridge 被引量:1

Technology for long cable erection of a thousand-meter scale cable-stayed bridge
下载PDF
导出
摘要 In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construction techniques,such as outspreading cable on deck,installing cable at pylon,pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.
出处 《Engineering Sciences》 EI 2009年第1期59-62,共4页 中国工程科学(英文版)
基金 National Science and Technology Support Program of China(No.2006BAG04B02)
  • 相关文献

参考文献4

  • 1Jin Zenghong.Introduction on the construction technology of the Akashi Kaikyo Bridge in Japan[].Foreign Highway.1999 被引量:1
  • 2Chen Mingxian.The construction technology of the cable-stayed bridge[]..2004 被引量:1
  • 3The First Highway Engineering Company of the Ministry of Com-munications of China.Handbook of highway construction-bridge bridge II[]..2003 被引量:1
  • 4S.L. Liu,,Z.T. Liang,J. L. Hou,and F. C. Meng.Cable Stayed Bridge[]..2002 被引量:1

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部