摘要
介绍了辽阳市中心医院大体积混凝土底板结构采用扣件式钢管支撑固定钢筋的方法,提出了大体积混凝土连续浇筑采取的冷却水管方案及裂缝控制技术措施,以积累大体积混凝土施工经验,提高混凝土工程质量。
Specifically for the Liaoyang city Zhongxin hospital, big volume concrete bottom board structure, has adopt the dyadic steel tube of fastener to prop up the method fixing a reinforced bar, has suggested that big volume concretes in a row, the waterpipe scheme cooling down and rift adopting control technology measure, so as to accumulate the construction experience of big volume concrete and enhance concrete.project quality.
出处
《山西建筑》
2009年第10期117-119,共3页
Shanxi Architecture
关键词
大体积混凝土
钢筋支撑
施工方案
裂缝控制
big volume concrete, reinforced bars prop up, scheme of construction, rift adopting control