1EdemOP, Akpan. A modified internal rate of return model for capital rationing in project selection. Production on Planning&Control, 1999, (8): 809-814. 被引量:1
2Paul R, Garvey P R, Lansdowne Z F. Risk matrix: an approach for identifying, assessing, and ranking program risks[J]. Air Force Journal of Logistics. 1998, (25):16-19. 被引量:1
3Lansdowne Z F. Ordinal ranking mettxxts for multicriterion decision making [J]. Naval Research Logistics,1996, (43) :613 - 627. 被引量:1
4LanMowne Z F, Woodward B S. Applying the Borda method[J]. Air Force Journal of Logistics, 1996, (20):27 -29. 被引量:1
5Lansdowne Z F. Risk matrix: an approach for prioritizing risks and tracking risk mitigation progress[A]. Proceedings of the 30th Annual Project Management Institute 1999 Seminars & Symposium[C]. Philadelphia, USA,1999. 被引量:1
6Ward S C. Assessing and managing important risks [J].International Journal of Project Management, 1999, (6) :331 - 336. 被引量:1
7James H. Lambert etc. Identification, Ranking, and Management of Risks in a Major System Acquisition [J].Reliability Engineering and System Safety 2001, (72):315-325. 被引量:1
8Hyo-Nam Cho etc. A Risk Assessment Methodology for Incorporating Uncertainties Using Fuzzy Concepts [J].Reliability Engineering and System Safety 2002, (78) : 173- 183. 被引量:1
9V. Carr & J. H. M. Tah. A Fuzzy Approach to Construction Project Risk Assessment and Analysis: Construction Project Risk Management System [ J ]. Advances in Engineering Software 2001, (32) :847 - 857. 被引量:1
10Dorota Kuchta. Use of Fuzzy Numbers in Project Risk( Criticality ) Assessment [ J ]. International Journal of Project Management, 2001, (19) : 305 - 310. 被引量:1