摘要
炳灵水电站采用了贯流机组厂顶过流式布置,泄洪表孔与厂房重叠布置,泄洪表孔工作闸门启闭机采用了顶升柱塞式液压启闭机,布置独特。该电站金属结构闸门、启闭机布置及设计吸收了国外同类型工程的设计经验,结合本工程特点和运行要求,布置紧凑、结构合理、设备运行良好,可供同类工程设计参考。
The Bingling Hydropower Station adopted the tubular turbine and the arrangement of the floodway to be built on the top of powerhouse. The flood-releasing surface hole is arranged on the top of powerhouse. The gate hoist of flood- releasing surface hole adopted top lifting piston hydraulic hoist. The arrangement is very unique. The layout and design of metal structure gate and hoist of the Station absorbed the design experience of similar foreign projects and combined with the characteristics and operation requirements of this project, so that its arrangement is close and structure rationaI and equipment operation good, which could be used for reference in the design of similar projects
出处
《水力发电》
北大核心
2009年第1期71-74,共4页
Water Power
关键词
厂顶过流
金属结构
布置
设计
炳灵水电站
overflow of powerhouse roof
metal structure
layout
design
Bingling Hydropower Station