摘要
介绍了禹门口提水工程概况,阐述了取水工程及预处理工程,提出了两种二次水沉淀处理方案,并进行了比选,最终确定方案一为水源工程的推荐方案。
This paper introduces the general situation of Yumenkou Water Pumping Works, expounds the water intake? project and pretreatment project, puts forward two secondary water precipitation treatment schemes and makes comparison, and determines that the scheme is the recommended proposal of the water sources project.