摘要 圆梁山隧道是渝怀线最长的铁路隧道,全长11 068m,是典型的岩溶隧道。隧道施工过程中共揭露了5个大型充填型溶洞,其中施工难度最大的2#溶洞为高压富水深埋粉细砂充填型溶洞。以该溶洞钻孔注浆施工为例进行了工效分析,并从注浆参数、注浆材料、机械配套和劳动力组织等几个方面对圆梁山隧道粉细砂充填型溶洞的钻孔注浆快速施工技术进行了探讨。 The total length of Yuanliangshan tunnel is 11068m, which is a typical karst tunnel and the longest tunnel on Chongqing-Huaihua railway. No. 2 karst cave filled with silty sand in high-pressure water abundant zone has the greatest difficulty in construction among the total 5 large filled karst caves in Yuanliangshan tunnel. Taking the borehole drilling and grouting construction of No. 2 cave as an example, the author make analysis on the construction efficiency and discusses the rapid construction technology of borehole drilling and grouting in karst caves filled with silty sand in Yuanliangshan tunnel in terms of grouting parameters, grouting materials, equipment matching and labor organization.
作者 张建法
出处 《隧道建设》 2009年第1期88-92,共5页 Tunnel Construction
关键词 圆梁山隧道 粉细砂 充填型溶洞 注浆 快速施工 工效分析 Yuanliangshan Tunnel fine silty sand filling karst cave grouting rapid construction construction efficiency analysis
  • 相关文献

参考文献4

二级参考文献13

共引文献9

同被引文献34

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部