Optimization on cut-hole of mining tunnel excavation 被引量:7

Optimization on cut-hole of mining tunnel excavation
下载PDF
导出
摘要 The efficiency of excavation a mining tunnel is definitely linked with modes of cut-holes. According to experience and methods of engineering analogy, the double-wedge cut, the 9-hole cut and the single spiral cut were determined originally by considering the production conditions and blasting environment of the mining tunnels of the-74 m horizontal in the Da-ye iron mine. Based on acquired modes of cut-holes, the effect of the cut was studied, on the one hand, by a numerical simulation method with the aid of LS-DYNA3D, a nonlinear dynamic finite element program; on the other hand, a spot experiment was carried out in the mining tunnels. Both the numerical simulation and the spot experiment demonstrated and agreed that a single spiral cut provides the optimum excavation effect. The efficiency of excavation a mining tunnel is definitely linked with modes of cut-holes. According to experience and methods of engineering analogy, the double-wedge cut, the 9-hole cut and the single spiral cut were determined originally by considering the production conditions and blasting environment of the mining tunnels of the -74 m horizontal in the Da-ye iron mine. Based on acquired modes of cut-holes, the effect of the cut was studied, on the one hand, by a numerical simulation method with the aid of LS-DYNA3D, a nonlinear dynamic finite element program; on the other hand, a spot experiment was carried out in the mining tunnels. Both the numerical simulation and the spot experiment demonstrated and agreed that a single spiral cut provides the optimum excavation effect.
出处 《Mining Science and Technology》 EI CAS 2009年第1期70-73,共4页 矿业科学技术(英文版)
关键词 mining tunnel excavation cut-hole optimization numerical simulation spot experiment 巷道采矿 钻孔掏槽 数值模拟 开采技术
  • 相关文献

参考文献7

二级参考文献36

  • 1陆爱珍,辛金生,富利娥.坚硬岩体巷道掘进爆破技术方案设计与试验[J].黄金科学技术,2001,9(5):39-41. 被引量:6
  • 2廖世金.一次爆破成井掏槽法探讨[J].矿业研究与开发,1994,14(1):11-14. 被引量:3
  • 3[1]中国矿业大学.井巷工程(修订二版)[M].北京:煤炭工业出版社,2004:59-60. 被引量:1
  • 4Hallquist J O. User manual DYNA2D-an explicit 2D hydrodynamic finite element code with interactive rezoning and graphical display[R].California: Livemore National Laboratory University of California at Lawrence, 1988. 被引量:1
  • 5Lee LE, Homing H C, Kury J W. Lawrence livermore laboratory[R].UCRL- 50442, 1986. 被引量:1
  • 6Snell C M, Swift R P, Marusak N L, et al. Canonical wall loading functions for decoupled cavities and containment vessels[A]. In:Proceedings of the Seventh Symposium on Containment of Underground Nuclear Explosions[C]. Washington: Booing Space Center East Kent, 1993. 23-43. 被引量:1
  • 7Terhune R W. Analysis of burial depth criteria for containment[R].[s. 1.]: UCRL - 52395, 1978. 被引量:1
  • 8北京理工软件技术开发有限公司.ANYSYS/LS.DYNA技术麻用报告[R].北京:北京理工软件技术开发有限公司,2002. 被引量:1
  • 9Livermore Software Technology Corporation. LSTC.LS-DYNA Keyword User's Manual Version 960[M]. Livermore: Livermore Software Technology Corporation, LSTC, 2001. 被引量:1
  • 10Hallquist J. LS-DYNA Theory Manual[M]. Livermore; Livermore Software Technology Corporation, LSTC, 1998. 被引量:1

共引文献114

同被引文献52

引证文献7

二级引证文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部