摘要 基于江苏宜兴抽水蓄能电站上水库主坝坝基抗剪桩施工存在的问题,对在特殊地质条件下大直径抗剪桩施工的主要流程、安全保障措施以及特殊问题处理进行了总结,提出在抗剪桩施工时宜采用"小进尺,强支护,多循环"的方法,为其他同类工程的施工提供了可借鉴的经验。 In view of problems found in shear-resistant pile engineering at foundation of reservoir main dam of Yixing pumped storage power station in Jiangsu, it discusses main procedures, safety precautions and special problems in large-diameter shear-resistant pile engineering under special geologic conditions. It proposes a way of "small footage, strong support, multi circulation" in shear-resistant pile engineering, which may be referred to by the engineering of other similar projects.
出处 《红水河》 2009年第1期24-27,共4页 Hongshui River
关键词 抗剪桩 坝基稳定 施工技术 抽水蓄能电站 shear-resistant pile dam foundation stability engineering technique pumped storage power station
  • 相关文献

参考文献6

二级参考文献2

  • 1常士骠.工程地质手册[M].北京:中国建筑工业出版社,1997.. 被引量:8
  • 2林在贯 高大钊 等.岩土工程手册[M].北京:中国建筑工业出版社,1996.478-519. 被引量:6

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部