摘要
内蒙古巴彦淖尔西部铜业有限责任公司于2007年10月开始进行150万t/a复杂铅锌矿试验投产和技术改造工作,经过历时一年的技术摸索和创新,最终取得了较为理想的技术经济指标。
The 1.5 Mt/a Lead-Zinc mine' s complex experiments which include the technical innovation and the test production, have been launched in October,2007 in Inner Mongolia Bayannaoer Western Copper Corporation. Some per- fect economical parameters and technical targets have been acquired finally through about a year' s technical attempt and innovation.
出处
《有色金属(矿山部分)》
2009年第1期72-74,共3页
NONFERROUS METALS(Mining Section)
关键词
铅锌矿
优先浮选
中矿再磨
技术改造
Lead-Zinc mine
priority flotation
re-grinding of the middle mine
technique innovation