摘要
介绍扬州港万吨级件杂码头水冲沉桩的施工工艺和桩基动测成果,并对水冲沉桩的控制标准、桩顶偏位和单桩竖向承载力的确定等问题进行了分析和建议。
AbstractThis paper introduces the construction technology and piling dynamic test result of the jet-pile driving of the 10,000DWT general cargo berth of Yang Zhou Port,giving analysis and propose regarding pile driving standard,allowance of pile top and pile bearing eapacity.
出处
《水运工程》
北大核心
1998年第5期38-39,共2页
Port & Waterway Engineering