摘要
为了扩大矿山生产能力,武山铜矿正进行大断面下向进路回采充填工艺和采场结构参数优化的试验研究。使用BlastmateⅢ测振仪对试验采场的充填体顶板进行了4次爆破震动实测,运用线形回归推导出了顶板的最大爆破振速公式,其测试数据和结论对类似矿山有一定的借鉴意义。
To increase the production capacity, Wushan copper mine is carrying out the optimization research on production technology and structure parameters on the occasion of downward stoping drifts with larger cross sectional area. The paper has tested the vibration effect on the stope roof for four times with Blastmate Ⅲ vibration meter, and concluded the formula of maximum velocity of roof by linear regression. The test data and formula may be helpful in other similar mines.
出处
《黄金》
CAS
北大核心
2009年第1期26-29,共4页
Gold
基金
江西省教育厅资助项目(GJJ09235)
关键词
回采进路
大断面
BlastmateⅢ测振仪
爆破震动
线形回归
Keywords:stoping drifts
large cross sectional area
Blastmate Ⅲ vibration meter
blasting vibration
linear re-gression ( ~: ~'~ )~'~:)