期刊文献+

大滩口水库坝前淤泥面加坝技术初探 被引量:3

Research on Technology of Increasing Dam Height on Sludge before Dam of Datankou Reservoir
下载PDF
导出
摘要 以大滩口水库坝前淤泥面上利用加坝自重形成堆载,对水库淤积层进行预压固结为例,针对库区淤积物这类饱和软土具有高压缩性、高灵敏度、高流变性和低强度、低渗透系数的工程特性,借助堆载预压地基处理计算理论,进行坝前淤泥面上加固设计,探求加固机理,制定加荷计划,为类似工程设计及安全施工起到了重要的指导作用。 Taking the preloading consolidation on the sludge before the dam of Datankou Reservoir by using the selfweight of increasing the dam height to form the piled load for example, and aiming at the engineering characteristics of the saturated soft soil in reservoir area such as the high compression, high sensitivity, high-rheologic behavior and low strength, low permeability, etc. , the reinforcing design on the surface of sludge before dam is made by using the theoretical caculations for the piled-load preloading and subgrade treatment, so as to research on the reinforcing mechanism and loading plan, which may provide the important guidance for the design and construction of other similar projects.
作者 马志坚
出处 《水利与建筑工程学报》 2009年第1期71-73,89,共4页 Journal of Water Resources and Architectural Engineering
关键词 坝前淤泥 加坝 预压设计 加荷计划 sludge before dam increasing dam height preloading design loading plan
  • 相关文献

参考文献5

  • 1JGJ79-2002.建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002 被引量:3
  • 2叶书麟主编..地基处理工程实例应用手册[M].北京:中国建筑工业出版社,1998:821.
  • 3GB50021-2002.岩土工程勘察规范[S].北京:中国建筑工业出版社,2002:46-47,73-74. 被引量:2
  • 4吴湘兴.土力学及地基基础[M].武昌:武汉大学出版社,1992:96-103. 被引量:1
  • 5.GB50007-2002.建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002.168-169. 被引量:11

共引文献12

同被引文献26

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部