7F. Sakai, A. Isoe& A. Umeda. A New Methodology for Control of Construction Accuracy in Cable- Stayed Bridge. Proceedings of 3rd EASEC. , Shanghai, China, 1991. 被引量:1
8J. I. Park, et al. Control System and Postprocessing in Erection of Composite Cable--Stayed Bridge. Proceedings of Deauville Conference,Cable--Stayed Bridges and Suspension Bridges, 1994. 被引量:1
二级参考文献10
1Tomaka, H., and Kamei, M. Cable tension adjustment bystructural system identification [ C ]. International Conference on Cable-stayed Bridges, Bangkok: Asian Institute of Technology, 1987, 856-868. 被引量:1
2Kalman, R. E. A new approach to linear filtering and prediction problems [J]. J. Basic Engrg., 1960, 82 (1): 35-45. 被引量:1
3Hoshiya, M., and Sutoh, A. Kalman filter-finite dement method in identification [J]. J. Engrg. Mech., ASCE,1993, 119 (2): 197-210. 被引量:1
4Ghanem, R., and Shinozuka, M. Structural system identification h theory [J]. J. Engrg. Mech., ASCE, 1995, 121(2): 255-264. 被引量:1
5$akai, F., Isoe, A., and Umeda, H. A new methodology for control of construction accuracy in cable-stayed bridges [ C].Proceeding of 3rd East Asian-Pacific Conference on Structural Engineering and Construction, Shanghai, China, 1991. 被引量:1
6Sorenson, H. W. Parameter estimation: principles and problems [M]. New York: Dekker, 1980. 被引量:1
10Park J I, Byun H K, Seo J W. Control System and Postprocessing in Erection of Composite Cable- Stayed Bridge[ C ]//Proceedings of Deauville Conference, Cable - Stayed Bridges and Suspension Bridges, Deauville, 1994:371 - 378. 被引量:1