摘要
南水北调中线陕西水源区水土流失严重,对中线工程的输水量及其水质造成了很大影响。为确保中线调水区水量和水质,依据研究区的历史资料与遥感解译资料对陕西水源区的水土流失现状及影响水土流失的因素进行了分析,并有针对性地提出了治理该区水土流失的具体措施。
The water source area of the middle route project for south-to-north water transfer in Shaanxi Province is a severe soil erosion area that may affect the diverted water quality. To ensure the diverted water quality in the project, the present situation of soil and water loss and the influence factors are analyzed based on the historical data and the remote sensing interpretation data. By analyzing soil erosion degree and various factors influencing soil and water loss, some specific and effective measures for controlling soil and water loss were put forward.
出处
《水土保持通报》
CSCD
北大核心
2008年第6期158-161,共4页
Bulletin of Soil and Water Conservation
基金
陕西省水土保持局专项"南水北调中线水源区水土保持生态补偿研究"课题
国家自然科学基金资助项目(40071005)
关键词
南水北调中线
水土流失
治理对策
陕西省
the middle route project for south-to-north water transfer
soil and water loss
countermeasure