摘要
通过采用合适的支架预压监控方法,为施工提供可靠的主梁施工监控预抬值,从而在保证桥梁施工安全及主梁线形满足设计要求的同时,达到缩短施工周期,取得很好效果,对满堂支架法施工的同类型桥梁具有借鉴意义。
The suitable pre- compressive method for monitoring is used to provide for construction with a reliable value of pre- raising height for monitoring the main girders, thus reducing the construction time and making better result while ensuring the safety of bridge construction and to meet the requirements for the alignment of the bridge alignment. Mso, it is of significance for the similar bridges with full -frame construction method.
出处
《内蒙古公路与运输》
2008年第5期29-31,共3页
Highways & Transportation in Inner Mongolia
关键词
满堂支架
施工监控
主梁立模监控预抬值
确定方法
full -frame method
construction monitor
pre -raising height for monitoring the main girder
determination