500kV海上斜钢管桩基础沉桩施工工艺 被引量:5

Sinking Pile Construction of 500 kV off Shore Oblique Pipe Pile Foundation
原文传递
导出
摘要 莆田LNG电厂500kV送出工程为国内首条海上大跨越工程,19号基础是第1座500kV线路的海中双回路铁塔基础。首次在国内采用斜钢管桩基础型式。塔基下方共布置45根钢管桩,四周布置42根防撞桩,斜桩的斜度为4∶1。工程采用大型打桩船的沉桩施工工艺,利用CPS RTK定位技术进行沉桩定位,沉桩尺寸误差均在允许误差范围,承载力均符合设计要求。 The No. 19 foundation of Putian LNG Power Plant 500kV Output Project is the first domestic off shore double-circuit tower foundation currently under construction, and is also the first time that oblique pipe pile foundation is used in 500 kV line in the nation. There is a total of 45 pipe piles underneath the foundation, which is surrounded by 42 crash prevention piles with a 4:1 pitch for oblique piles. Sinking pile construction is performed by large pile driving barges, and sinking piles are positioned using GPS RTK technology. Errors of pile size are within tolerance, and load bearing capacities meet design requirements.
作者 张德美
出处 《电力建设》 2008年第12期58-62,共5页 Electric Power Construction
基金 国家重点工程蒲田LNG电厂的配套送出工程(20081891)。
关键词 海上斜钢管桩基础 打桩船 沉桩施工 off shore oblique pipe pile foundation pile driving barge sinking pile construction
  • 相关文献

参考文献7

  • 1JTJ254-98.港口工程桩基规范[S].[S].,.. 被引量:91
  • 2JTJ221-98.港口工程质量检验评定标准[S].[S].,.. 被引量:28
  • 3JTJ249-2001.港口工程桩基动力检测规程[S].[S].,.. 被引量:18
  • 4同济大学.海上打桩GPS-RTK定位系统[S].上海:上海市科学技术委员会.2004. 被引量:1
  • 5高大钊编著..桩基础的设计方法与施工技术[M].北京:机械工业出版社,1999:181.
  • 6钢管桩的设计与施工[S].北京地震出版社,1993. 被引量:1
  • 7JTJ203-2001.水运工程测量规范[S].[S].,.. 被引量:55

共引文献180

同被引文献33

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部