期刊文献+

遥感卫星任务规划问题研究现状与展望 被引量:3

A Survey on Mission Planning for Remote Sensing Satellites
下载PDF
导出
摘要 随着遥感卫星的发展以及遥感应用需求的增加,遥感卫星任务规划问题日益突出。本文分析遥感卫星任务规划问题的分类和主要约束,分别从模型表示及求解算法两方面分析卫星任务规划的研究进展。最后,针对多颗遥感卫星的任务规划,指出未来的研究方向。 Mission planning for remote sensing satellites is increasingly complicated with the evolution of both satellites and observation requests. This article is a survey into the classifications and constraints in this field and it presents a review of achievements in models and algorithms. Challenges and future areas of research for coordinated multi-satellite observation are also discussed.
出处 《飞行器测控学报》 2008年第5期1-8,共8页 Journal of Spacecraft TT&C Technology
基金 国家自然科学基金资助项目“成像侦察卫星计划管理中多卫星联合调度问题研究”,编号70601035
关键词 遥感卫星 任务规划 智能优化算法 Remote Sensing Satellites Mission Planning Intelligent Optimization Algorithms
  • 相关文献

参考文献39

  • 1Cordeau J-F, Laporte G. Maximizing the Value of an Earth Observation Satellite Orbit[J]. Journal of the Operational Research Society, 2005, 56(8):962-968. 被引量:1
  • 2贺仁杰..成像侦察卫星调度问题研究[D].国防科学技术大学,2004:
  • 3Lemaitre M, Verfaillie G. Selecting and Scheduling Observations of Agile Satellites[J]. Aerospace Science and Technology, 2002,(6) :367 381. 被引量:1
  • 4阮启明..面向区域目标的成像侦察卫星调度问题研究[D].国防科学技术大学,2006:
  • 5阮启明,谭跃进,李永太,陈英武,贺仁杰.基于约束满足的多星对区域目标观测活动协同[J].宇航学报,2007,28(1):238-242. 被引量:30
  • 6Gabrel V, Vanderpooten D. Enumeration and Interactive Selection of Efficient Paths in a Multiple Criteria Graph for Scheduling an Earth Observing Satellite[J].European Journal of Operational Research, 2002,139(3): 533-542. 被引量:1
  • 7王均.成像卫星综合任务调度模型与优化方法研究[D].长沙:国防科技大学博士学位论文,2007. 被引量:1
  • 8李菊芳,谭跃进.卫星观测系统整体调度的收发问题模型及求解[J].系统工程理论与实践,2004,24(12):65-71. 被引量:24
  • 9李菊芳.航天侦察多星多地面站任务规划问题研究[D].长沙:国防科技大学博士学位论文,2005. 被引量:1
  • 10Bensana E, Verfaillie G. Lemaitre M. Earth Observing Satellite Management [J]. Constraints. 1999,4(3): 293-299. 被引量:1

二级参考文献31

  • 1李菊芳,谭跃进.卫星观测系统整体调度的收发问题模型及求解[J].系统工程理论与实践,2004,24(12):65-71. 被引量:24
  • 2郑昌文,李磊,徐帆江,丁明跃,苏康.基于进化计算的无人飞行器多航迹规划[J].宇航学报,2005,26(2):223-227. 被引量:29
  • 3Jeremy Frank, Ari Jonsson, Robert Morris, etc.Planning and scheduling for fleets of earth observing satellites[A].Proceedings of the 6th International Symposium on Artificial Intelligence.Robotics, Automation and Space 2002[C].Montreal, 2002. 被引量:1
  • 4Wolfe W, Sorensen S.Three scheduling algorithms applied to the earth observing domain[J].Management Science, 2000, 46(1): 148-168. 被引量:1
  • 5Snezana Mitrovic-Minic.Pickup and delivery problem with time windows: a survey[R].ftp://fas.sfu/pub/cs/techreports, 1998. 被引量:1
  • 6ILOG Corporation.ILOG Optimization Suite: White Paper[CP/DK].France,2001. 被引量:1
  • 7Patrck Prosser, Paul Shaw.Study of Greedy Search with Multiple Improvement Heuristics for Vehicle Routing Problems[EB/OL].http://www.dcs.st-and.ac.uk/-apes/ papers/RR201.ps.gz, 1996. 被引量:1
  • 8Globus Al,Crawford J,Crawford J.Scheduling earth observing fleets using evolutionary algorithms:problem description and approach[C]// Proceedings of the 3rd International NASA Workshop on Planning and Scheduling for Space,NASA,2002 被引量:1
  • 9Globus Al,Crawford J,Lohn J.A comparison of techniques for scheduling earth observing satellites[C]// Proceedings of AAAI 2004,2004 被引量:1
  • 10Morris R A,Dung J,Dungan J.An integrated approach to earth science observation scheduling[C]// Proceedings of ESTC2003,2003 被引量:1

共引文献75

同被引文献20

  • 1何清举,孙前贵.利用GNSS实现高轨卫星自主导航的新方案[J].飞行器测控学报,2010,29(1):7-11. 被引量:5
  • 2刘洋,代树武,孙辉先.卫星有效载荷的规划与调度[J].航天控制,2004,22(5):73-76. 被引量:6
  • 3Baudoin A. Beyond spot 5:pleiades,part of the French-Italian program orfeo[C]//The 20th Int Archives Photogrammetry and Remote Sensing Congr.Istanbul,Turkey:ISPRS,2004:260-267. 被引量:1
  • 4Gabrel V, Moulet A,Murat C,et al.A new single model and derived algorithms for the satellite shot planning problem using graph theory concepts[J].Annals of Operations Research.1997,69:115-134. 被引量:1
  • 5Mancel C, Lopez P.Comlex optimization problems in space systems[C]//13th International Conference on Automated Planning & Scheduling(ICAP′03).Trento,Italy:ICAP,2003:1-5. 被引量:1
  • 6Li Y, Xu M Q,Wang R X.Scheduling observations of agile satellites with combined genetic algorithm[C]//Third International Conference on Natural Computation.Piscataway,NJ:IEEE,2007,3:29-33. 被引量:1
  • 7Wang P, Reinelt G,Gao P,et al.A model,a heuristic and a decision support system to solve the scheduling problem of an earth observing satellite constellation[J].Computers & Chemical Engineering.2011,61(2):322-335. 被引量:1
  • 8Romain G B, Gabrel V,Antoine F.Building a really executable plan for a constellation of agile earth observation satellites[EB/OL].[2013-06-18].http://www.congrex.nl/11c05/Papers/GrassetBourdel_paper.pdf. 被引量:1
  • 9Wu G H, Liu J,Ma M H,et al.A two-phase scheduling method with the consideration of task clustering for earth observing satellites[J].Computers & Operations Research.2013,40(7):1884-1894. 被引量:1
  • 10Beaumet G, Gabrel V,Charmeau M C,et al.Feasibility of autonomous decision making on board an agile earth-observation satellite[J].Computational Intelligence.2011,27(1):123-139. 被引量:1

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部