摘要
宝泉抽水蓄能电站500kVGIS设备安装是整个电站机电安装中的关键项目之一,具有设备体积大、安装工艺复杂、施工工期长等特点,从实用角度出发,分别介绍GIS安装准备工作、设备安装、气体作业等内容和方法,并进行了总结。
The erection of 500kV GIS equipment for the Baoquan Pumped Storage Power Station is one of the key items in the electro-meehanical installation works, with features of bulky parts, complex erection techniques and long erection period, etc. This paper describes the working activities and methods of GIS erection and preparation, equipment installation and gas work, viewed from practice.
出处
《水力发电》
北大核心
2008年第10期73-74,77,共3页
Water Power
关键词
安装流程
测量放线
法兰面清洁
紧固力矩
气体作业
erection procedures
measurement and setting out
flange surface eleaning
tightening torque
gas handing