摘要
在河南国网宝泉抽水蓄能电站上水库工程监理过程中,中国水利水电建设工程咨询公司施工监理一部始终坚持以监理委托合同、施工承包合同和监理规范为依据,围绕"三控制、二管理、一协调"这一监理工作的核心内容,以安全为前提,以质量为中心,以进度为主线,以投资为重点,以效益为目标的监理原则,进行施工全过程全面的动态控制,使工程建设始终处于受控状态。
During the construction supervision on the upper reservoir of the Baoquan Pumped Storage Power Station, the Construction Supervision First Division of China Water Resources and Hydropower Engineering Consulting Corporation always adheres to taking the supervision contract, construction contract and supervision specifications as its basis, taking the work of "Three Controls, Two Managements and One Coordination as its supervision core, the safety as its prerequisite, the quality as its center, the progress as its main line, the investment as its focus point, the benefits as its goal, in order to carry out the full dynamic control on the whole process of construction and to make the construction of project always under control.
出处
《水力发电》
北大核心
2008年第10期54-56,共3页
Water Power
关键词
监理
质量控制
进度控制
投资控制
上水库
宝泉抽水蓄能电站
upper reservoir project
supervision
quality control
progress control
investment control
Henan Guowang Baoquan Pumped Storage Power Station