摘要
本文对上海地铁一号线常熟站至陕西站区间隧道贯通测量技术进行论述,包括地面平面和高程控制测量、将平面和高程通过竖井引入隧道、准确控制隧道盾构掘进按预留洞口精确贯通。
This paper describes the technique of breakthrough measurement in Shanghai No. 1 Subway Survey, which includes the control surveying for ground and elevation. This technique can ensure the excavation in pointed direction.
出处
《工程勘察》
CSCD
北大核心
1997年第5期51-54,61,共5页
Geotechnical Investigation & Surveying