摘要
结合柏叶口水库工程概况和施工导流条件,对全断面施工导流方案和分期导流方案进行了比选,推荐采用分期导流方案。
Connecting with the general situation and construction diversion conditions of Baiyekou Reservoir, this paper compares and selects the full-section construction diversion scheme and diversion scheme by stages, and recommends the diversion scheme by stages.
出处
《科技情报开发与经济》
2008年第25期210-211,共2页
Sci-Tech Information Development & Economy
关键词
柏叶口水库
施工导流
方案比选
Baiyekou Reservoir
construction diversion
scheme comparison and selection