期刊文献+

变换气脱硫再生系统的喷射再生改造

Ejection Regeneration Reformation in De-sulfur Regeneration System for Shifting Gas
下载PDF
导出
摘要 论述了变换气脱硫再生系统由高塔再生改为喷射再生的改造过程。对比了高塔再生和喷射再生的工艺流程和设备配置;阐述了喷射再生改造中工艺流程、吸收塔、喷射再生槽、喷射器的改进方案;通过对改造前后的运行数据对比和经济效益分析,总结了喷射再生的改造效果。 Author has discussed the reformation process in which shift gas de-sulfur regeneration system was changed from high tower regeneration into injecting regeneration. The process flow and equipment layout were compared for high tower regeneration with ejecting regeneration; has described the improvement scheme of process flow, ,absorber, ejecting regeneration tank and ejector; has calculated the key dimensions of regeneration tank, sprayer, mix pipe ; through comparison of the operating data before and after reformation as well as economic benefit analysis, the reformation effect of ejecting regeneration was summarized .
出处 《化肥设计》 CAS 2008年第5期42-43,共2页 Chemical Fertilizer Design
关键词 变换气脱硫 喷射再生 高塔再生 喷射器 喷嘴 再生槽 改造 shift gas de-sulfur ejecting regeneration high tower regeneration ejector sprayer regeneration tank reformation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部