1James H Lambert,et al. Identification,Ranking,and Manangement of Risk in a Mayor System Acquisition [J]. Reliability Engineering and System Safety,2001,72(3) :315-325. 被引量:1
2Hyo-Nam Cho,et al. A Risk Assessment Methodology for Incorporating Uncertainties Using Fuzzy Concepts [J]. Reliability Engineering and System Safety,2002,78(2) :73-183. 被引量:1
3V Carr,J H M Tah. A Fuzzy Approach to Construction Project Risk Assessment and Analysis:Construction Project Risk Management System [J]. Advances in Engineering Software,2001,32( 10/11 ) :847-857. 被引量:1