摘要
对安迪尔大桥施工的准备工作以及主要设备进行了介绍,同时给出了吊装方案以及注意事项;最后,对贝雷桁架组合式梁架桥机的有关部位承力进行了机体计算。实践证明,采取的施工方案是合理的,施工措施有效地保证了施工安全和工期,顺利地完成了施工任务,在以后的施工中可以借鉴。
The preparatory work and major equipment for the construction of Andel Bridge are introduced, the scheme for hoisting and caution are given. The force bearing of associated parts of Bailey Truss combined bridge machine is calculated in the end. The practice proves that the scheme adopted is rational, the construction measure effectively ensures the safety as well as time limit of construction and helps accomplish the task successfully, which can be referred in later construction.
出处
《筑路机械与施工机械化》
北大核心
2008年第10期66-68,共3页
Road Machinery & Construction Mechanization
关键词
T梁
吊装
施工
贝雷桁架
T beam
hoisting
construction
Bailey Truss