期刊文献+

上海市成都路雨水调蓄池的设计和运行效能分析 被引量:26

Design and Operation Efficiency Analysis of Chengdu Road Stormwater Retention Tank of Shanghai City
下载PDF
导出
摘要 上海市成都路雨水调蓄池的主要作用是截流储存成都路服务区的初期雨水,以减少泵站的雨天排江水量和排江负荷。详细介绍了调蓄池容积的计算方法以及调蓄池池体、池底和进出水系统的设计方法。提出了调蓄池的合理运行模式,对2007年调蓄池汛期运行效能进行了分析,阐述了影响调蓄池效能的关键因素,并就其发挥更大效能提出了合理化建议。 The principal effect of Chengdu Road stormwater retention tank is to intercept and store the initial stormwater from the service area of Chengdu Road so as to reduce the river discharge volume and load of pump station during heavy rainfall. The calculation methods of the retention tank volume and the design methods of the tank body, the tank bottom and the inflow and outflow systems are introduced in detail. The reasonable operation mode of the retention tank is put forward. By analyzing the operation efficiency of the retention tank during the rainfall period in 2007, the key factors influencing the efficiency of the retention tank are expounded, and the rationalized suggestions to exert its greater efficiency are made.
出处 《中国给水排水》 CAS CSCD 北大核心 2008年第18期33-36,共4页 China Water & Wastewater
关键词 雨水调蓄池 设计 运行效能 stormwater retention tank design operation efficiency
  • 相关文献

参考文献2

  • 1EPA/625/R-93/007, U. S. Environmental Protention Agency, Combined Sewer Overflow Control[ S]. 被引量:1
  • 2AMSA. Approaches to Combined Sewer Overflow Program Development:A CSO Assessment Report[ R]. Washington, D. C. :Association of Metropolitan Sewerage Agencies, 1994. 被引量:1

同被引文献172

引证文献26

二级引证文献104

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部