弦支穹顶拉索张拉过程现场监测与数值模拟 被引量:2

Field Monitoring and Numerical Assessment on Cable Stretching Process of a Suspended-dome
下载PDF
导出
摘要 对武汉体育中心二期工程体育馆新型弦支穹顶钢屋盖的拉索张拉过程进行了现场监测和数值模拟。通过拉索张拉过程中对拉索内力、结构关键节点相连杆件应变、支座节点位移和整体变形的监测和分析,得到了其变化规律和屋盖受力特点:在拉索张拉过程中,中环索对外环索的影响大于内环索对中环索的影响;屋盖支座节点的位移均指向屋盖的中心;所测杆件具有较大安全储备,仅外径索附近个别杆件受力较大,施工时应引起注意。 The field monitoring and the numerical assessment are performed on cable stretching process of a suspendeddome. The cable stress, key bar strain, node displacement and dome deformation were monitored and analyzed. It is concluded that the middle-cable effect on the outer-cable is more significant than the inner cable effect on the middle-cable in the process, and the dome node displacements are toward the dome center. The monitored bars are safe in the stretching process, of which the outer cable should be monitored especially.
出处 《武汉理工大学学报》 EI CAS CSCD 北大核心 2008年第9期93-97,107,共6页 Journal of Wuhan University of Technology
关键词 弦支穹顶 拉索张拉过程 施工监测 数值模拟 suspended-dome cable-stretching process construction monitoring numerical assessment
  • 相关文献

参考文献8

二级参考文献18

  • 1刘锡良,夏定武.索穹顶与张拉整体穹顶[J].空间结构,1997,3(2):10-17. 被引量:16
  • 2Hosozawa Osamu, Shimamura Kouhei, Mizutani Taro. The role of cables in large span spatial structures: introduction of recent space structures with cables in Japan [J]. Engineering Structure, 1999, 21(8): 795-804. 被引量:1
  • 3Saitoh Masao, Okada Akira. The role of string in hybrid string structure [J]. Engineering Structure, 1999, 21(8): 756-769. 被引量:1
  • 4R.B. Fuller. Explorations in the geometry of thinking[ M ]. Macmillan,New York, 1975. 被引量:1
  • 5D.H. Geiger. Design details of an elliptical cable dome and a large span cable dome under construction in the United States [ C ]. Proc.IASS Symp., Vol.2,1986. 被引量:1
  • 6D.H. G eiger. The design and construction of two cable domes for the Korean Olympics, Shells, Membranes and Space Frames[ C]. Proc.IASS Symp., Vol.2,1988. 被引量:1
  • 7M.P. Levy. The Georgia dome and beyond achieving lightweightlongspan structure[ C]. Proc, IASS-ASCE, Int. symp., 1994. 被引量:1
  • 8M.P. Levy. Hyper-tensegrity dome [ C ]. Proc. Int. Conf. Sports Architecture, 1990. 被引量:1
  • 9M.P. Levy. The innovation of lightness[C]. IASS Bulletin, Vol.35,No. 115,1994. 被引量:1
  • 10Geiger D H.The design and construction of two cable domes for the Korean Olympics.shells,memberanes and space frames[C]//Proc.IASS Symp.,1986,2:265-272 被引量:1

共引文献69