摘要
青岛焦化制气有限公司采用捣固焦炉生产铸造焦,通过配煤比的调整和生产过程控制,采用小铁箱试验、小焦炉试验和单孔试验,得出了最佳的操作参数,生产出合格的铸造焦,优化了资源,实现了产品的技术升级换代。
Production foundry cokes by stamp-charging coke oven have been applied in Qingdao Coking Gas Limited liability Company, through adjusting of coal blending ratio and control of production process, little iron box test,little coke test and monotrematous test, prime manipulation parameter has received, eligible foundry cokes have been gained, by which resources have been optimized, and production technology improved greatly.
出处
《山东冶金》
CAS
2008年第3期54-56,共3页
Shandong Metallurgy
关键词
铸造焦
捣固焦炉
焦炭质量
foundry coke
stamp-charging coke oven
coke quality