摘要
针对隧道施工中每个断面的稳定性问题,提出了超前地质预报和监控量测相结合的动态设计方法,对西攀高速公路C11合同段酸水湾隧道在施工中超前地质预报及量测所取得的成果进行了分析和总结。
According to the stability of the section in the tunnel construction, the author puts forward the dynamic design method combined the advanced geological forecast with the monitoring measurement, analyzes and summarizes the results obtained by the advanced geological forecast and the measurement in the construction of the Suanshuiwan tunnel of C11 contract section of Xi-Pan expressway.
出处
《山西建筑》
2008年第26期321-322,共2页
Shanxi Architecture
关键词
超前地质预报
监控量测
成果分析
动态设计
advanced geological forecast, monitoring measurement, result analysis, dynamic design