悬臂浇注施工斜拉桥的误差控制方法 被引量:3

Method of construction error control for cantilever-casting cable-stayed bridge
下载PDF
导出
摘要 在预应力混凝土(PC)斜拉桥悬臂施工中,为了减小索力及线形误差,分析了误差原因及其控制现状,提出了模型误差及悬浇效应误差的控制方法。结合三维实体等参元和板壳单元的优点,构造了适用于复杂桥梁结构空间分析的实体退化单元,建立了离散钢筋模型。根据挂篮牵索锚固点处的变形协调条件,推导出牵索索力随混凝土浇筑的增量计算公式,建立了悬浇过程中各工况下挂篮前端标高控制的计算公式。应用结果表明:在悬浇施工过程,牵索索力控制精度达到了3%,成桥索力控制精度达到5%,悬臂端标高误差控制在1 cm内,因此,提出的控制方法可实现PC斜拉桥悬浇过程各工况下索力及线形的准确预测。 During the cantilever-casting construction of prestressed concrete(PC) cable-stayed bridge, in order to reduce the errors of cable tension and line shape, the error cause and present situation of control means were analyzed, and the control methods of model error and cantilever- casting simulation error were discussed. With the combination of 3D isoparametric element and shell element, degenerated solid element was proposed for the spatial analysis of complex PC bridge, and discrete bar model was set up. According to the deformation compatibility condition of traction cable's anchorage, the increment of cable tension during casting concrete was computed, and the calculation formula of traveler's front level was educed. Application result indicates that the control precision of trailing cable tension is within 3 %, the control precision of final cable tension is within 5%, and the error of traveler's front level is within 1 cm. Therefore, the cable tension and line shape of PC cable-stayed bridge under all construction conditions can be well predicted by the proposed method. 4 tabs, 8 figs, 13 refs.
出处 《交通运输工程学报》 EI CSCD 北大核心 2008年第4期61-67,共7页 Journal of Traffic and Transportation Engineering
基金 国家自然科学基金项目(50708091)
关键词 桥梁工程 混凝土斜拉桥 误差控制 悬臂浇注 施工误差 bridge engineering concrete cable-stayed bridge error control cantilever casting construction error
  • 相关文献

参考文献13

二级参考文献49

共引文献205

同被引文献18

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部