摘要
汶川里氏8.0级大地震,造成震区范围内许多具有价值的文化资产受到严重损毁。以台湾9.21集集大地震后的紧急修复经验为例,建议将此次震灾地区历史建筑修复过程中所累积的经验,转换为一般性常态机制,在法令制度、技术上提出一套地震灾害时的紧急应变机制,通过此应变机制让历史建筑在遭遇地震灾害时能将损坏程度降至最低,并协助相关人员进行灾后修复工作。
2: 28p.m. May 12, 2008, a powerful magnitude-8 earthquake jolted Wenchuan County of southwest China's Sichuan Province. It caused great damage to many valuable cultural assets in the quake-hit regions. This research is by a case study of emergency post-disaster reconstruction of Taiwan after the "9.21" Jiji earthquake. Such experience accumulated on the historical building's restoration of Taiwan's "9.21" earthquake, which is transformed into a useful permanent system. This paper proposes an emergency reaction mechanism to earthquake disaster at the aspect of the law, regulation and technology, which can reduce the earthquake damage to the lowest of the historical buildings, and assist relevant people to post-quake restoration and reconstruction.
出处
《新建筑》
2008年第4期87-90,共4页
New Architecture